SMT007 Magazine

SMT007-Jan2019

Issue link: https://iconnect007.uberflip.com/i/1067105

Contents of this Issue

Navigation

Page 7 of 111

8 SMT007 MAGAZINE I JANUARY 2019 Nolan's Notes by Nolan Johnson, I-CONNECT007 Supply Chain in Crisis The ripples start at the very front of the process. The engineering and design teams make choices about the performance charac- teristics for their project, then select compo- nents that fit their performance windows. Hundreds and even thousands of little choices must be made about which capacitor, resistor, tolerances, materials, and packages; it goes on and on and on. In a traditional design flow, the project team tends to use the parts they already know and have footprints for—maybe a little long in the tooth, but known quantities, after all. Except these are not traditional times. Component supplies, prices, and lead times are in a great deal of turmoil. The automotive, IoT, and telecommunications sectors are vacu - uming components out of the supply chain at a record pace, exerting influences like early obso- lescence of older components and more. With the design completed, the design team passes the bill of materials—including components and the fabricated board, etc.— to the procurement folks. The job is done for the design team, right? Not so fast. Some of those little component decisions—especially the ones to go with a tried-and-true, always- been-there, two-cent passive— may actually be little bombs waiting to go off in that BOM. Procurement takes over, goes through the BOM line-by-line, and finds all sorts of parts that are no longer able to be sourced through primary suppliers. Those time-honored big- package discretes have gone end of life! Noth - ing in that size can be found! By the time the buyer finds something that fits the performance specifications, it's in a 0201 package—but the BOM calls for a 0804. Now, the procurement team sends two memos: one to the design team to identify the sourcing stalemate, and one to the product manager to tell them the new product introduction sched - ule is now at risk. Then, procurement makes a flurry of phone calls to try to source parts in non-primary channels, maybe even turning in desperation to grey-market sources. The problem is even if this crisis gets resolved in procurement, the team still isn't in the clear. As fast as component availability is changing currently, things aren't sorted just because the project has moved into manufacturing. Those parts shortages could still arise during manu - facturing or between the first and second production runs. No, it isn't over yet. It seems like it right now, but it's never over.

Articles in this issue

Archives of this issue

view archives of SMT007 Magazine - SMT007-Jan2019