SMT007 Magazine

SMT007-Oct2021

Issue link: https://iconnect007.uberflip.com/i/1415897

Contents of this Issue

Navigation

Page 37 of 111

38 SMT007 MAGAZINE I OCTOBER 2021 the detailed workcell analyses for the affected manufacturing workcell pro- cesses. is involves the entire organi- zation as seen in Figure 5. e methodology will involve tim- ing all the work and information for this manufacturing process, including set-up times and information logging and instructions from work orders. Ta- ble 2 shows the analysis of the current manufacturing process. e process work center analysis (PWA) is the multilayer lay-up pro- cess, as seen in Figure 5. Human set- up time to collect all the materials was 15 minutes. It took five minutes to read instructions from the work order trav- eler. e inner layer for the multilayer will be stacked and drilled for tooling holes—25 minutes machine time and 25 minutes human time. It took 20 min- utes to record in the production log. Figure 5: Planning the automation program will help insure successful completion.

Articles in this issue

Archives of this issue

view archives of SMT007 Magazine - SMT007-Oct2021