I-Connect007 Magazine

I007-Nov2026

IPC International Community magazine an association member publication

Issue link: https://iconnect007.uberflip.com/i/1547617

Contents of this Issue

Navigation

Page 107 of 129

108 I-CONNECT007 MAGAZINE I NOVEMBER 2026 BY K E L LY ATAY, AS C S U N STO N E A well-executed, collaborative quote process is vital to manufacturing quality PCBs. PCB designs are like football plays in that a lot can happen between the chalkboard (aka CAD tool) and the playing field (aka production floor). No mat- ter how well the play is drawn up, you still have to snap the ball and play the game. Designers should be prepared. Even when designers and manufac- turers check all the boxes and work closely togeth- er, things can still go wrong. That's because events don't always go as planned between the quote phase and product shipment. In football, when the ball is in the hands of the quarter- back and the defensive line is coming at them, plan- ning is only one part of preparation. If the players aren't schooled in how to deal with specific intan- gibles, the play can devolve into chaos. The shop floor doesn't get as messy as a blown football play, but if the team doesn't account for potential issues during the quote phase and take appropriate action, there can be unexpected prob- lems during production: • Production delays are more common today because of continued supply chain disruption. Raw materials shipments can get delayed, creating inventory shortages and slowing overall manufacturing. We recommend designers build some padding into their timelines, if possible, just in case. C O N N ECT T H E D OTS From the Playbook to the Production Floor

Articles in this issue

view archives of I-Connect007 Magazine - I007-Nov2026