IPC International Community magazine an association member publication
Issue link: https://iconnect007.uberflip.com/i/1547617
110 I-CONNECT007 MAGAZINE I NOVEMBER 2026 • Since it is often hard to pad timelines in a fast-paced environment, manufacturers can find themselves rushing to respond to quote requests. If a quote response is rushed or the fabricator is not prepared for quick-turns, mistakes become more likely. When teams hurry, tasks such as the DFM check can be approved too quickly, which can lead to mid- production discoveries that result in surcharges or increased scrap risks. Fabricators should not sacrifice thoroughness for speed. • PCB manufacturers can only carry so much inventory, and these days it is more likely than not that the next supplier shipment will be more expensive than the last. Sourcing issues can also lead to cost overruns. When suppliers' costs go up, they pass them on to fabricators, sometimes with little warning. Quote responses are often based on the most recent component costs, but if prices change or long lead times necessitate an alternate supplier, this can affect the final assembly bill. To avoid this issue, it is important for manufacturers to keep their supplier's costs up to date and quote accordingly. Best Practices for Dealing With Production Intangibles Here are some ways designers and fabricators can work together during the quote phase to avoid problems that can derail production: • Instead of trusting ChatGPT's research on general industry availability, designers should reach out to manufacturing partners to determine material availability and cost while still in the design phase. • Design complexity for vias and controlled impedance can impact the time and effort needed to produce a board. Elements like non-conductive vias introduce complexity to quoting that makes it difficult to quickly turn an accurate quote. Designers need to be aware of how these components impact the quote process and plan accordingly. • Complex designs require more time to quote and build. PCB designs with many layers, multiple blind via sets, and specialized materials will naturally take longer to quote. If a design takes more time to quote, it may also take more time to build. If a project is on a tight timeline, designers can work with the fab team to find ways to accelerate production and keep product development on track. Time spent in the prototyping phase listening to each other is particularly valuable. • Context is important. Fabricators often do not know how the PCBs they manufacture will be used. This places additional burden on the designer to produce a near-perfect quote request and leaves the manufacturer unaware of how environmental factors could impact board performance. In many cases, if designers can inform manufacturers about how the board will be used, it can kick-start a conversation that will speed the prototyping phase, help optimize performance, and reduce production costs. To ensure PCB manufacturing produces the desired quality and yield, much like the offense changing or altering the play at the line of scrimmage because of a defensive shift, the designer and fab team can work together to tweak the design or its specifica- tions for any number of reasons, including materials availability, time constraints, or unearthed information about the finished board's application. I-CONNECT007 Kelly Atay is the sales and marketing manager at ASC Sunstone. To read past columns from ASC Sunstone, click here. Trick plays require additional preparation The nature of the quote itself can create intangibles for the team. Designers need to be aware if their design creates a need for specialized manufacturing processes. Does the quote require advanced test- ing or inspection? Will it create non-standard engineering costs? Is specialized tooling, setup, or a custom test fixture needed? Designers should be aware of how specialized requirements can impact costs, so they are not surprised by increases to the per-unit price or post-quote cost add-ons. C O N N ECT T H E D OTS

