Issue link: https://iconnect007.uberflip.com/i/978458
MAY 2018 I PCB007 MAGAZINE 73 drill/router area (Figure 12) 5. The fully integrated horizontal Atotech plating area (Figure 13) The new Whelen facility is now running fi- nal startup panels alongside of the current au- tomated facility. Commercial operation is ex- pected to begin in late this spring. An informative interview with the principals of AWP and Whelen's Alex Stepinski, conduct- ed at productronica 2017, and published in the January 2018 issue of PCB007 Magazine [1] . Figure 7: Details of front of solder mask line. Figure 8: Middle part of solder mask line.