Issue link: https://iconnect007.uberflip.com/i/1507822
56 PCB007 MAGAZINE I SEPTEMBER 2023 Schweitzer engaged the services of Green- Source Engineering to assist in the initial design of the facility, along with handling auto- mation equipment. Nolan Johnson met with the GreenSource team— Michael Gleason, Marco Mirkovic, James Brown, and Rick Nich- ols—representing GreenSource Engineering and GreenSource Fabrication (GSF), to better understand their working relationship for the build-out of the new facility in Moscow, Idaho. Your organization was involved with Schweitzer's greenfield facility in Moscow, Idaho. What was your role there? Rick Nichols: Essentially, we placed a high degree of automation in their facility. Once the word went out that we had successfully built a plant in New Hampshire, primarily fielding our own equipment along with the zero liquid discharge (ZLD) unit—which is a key compo- nent to any greenfield site—we got involved GreenSource Engineering: An Eye on Design SEL SPECIAL SECTION From left: GreenSource Engineering (GSE) double loader, photoresist strip line, GSE unloader.