Design007 Magazine

Design007-Jan2019

Issue link: https://iconnect007.uberflip.com/i/1071356

Contents of this Issue

Navigation

Page 9 of 97

10 DESIGN007 MAGAZINE I JANUARY 2019 Feature by John Watson, CID BUILDING CONTROL SYSTEMS, LEGRAND INC. Most of us are familiar with the defense readiness condition (DEFCON) levels. If we could apply such a DEFCON level to the electronics industry and how it relates to the issue of component shortages, we would be sitting at a DEFCON 1, meaning nuclear war is imminent. This issue has a huge effect on everyone who works in the electronics field, impacting schedules and how things are done. The problem began to hit in earnest about a year ago in 2017. It first appeared as longer lead times on multilayer ceramic capacitors (MLCCs) and tantalum capacitors. With longer lead times, the available stock began to disappear, and before we knew it, we had a perfect storm and an international crisis. From where we stand now, at the beginning of 2019, we see lead times for some components in the short range of up to 16 weeks; medium-to-high is 32 weeks, and long lead times are as far out as 80 weeks. In other words, if we ordered a component today, it would arrive in over a year a half from now (maybe). This all started with the capacitors (we will see why later), but we now see other component series being sucked into this problem (Figure 1). With such volatility in the market, it has brought those who were not prepared for it t o a standstill. The Electronic Component Shortage Crisis: A Veteran Engineer's Perspective Figure 1: Common parts in short supply with typical lead times.

Articles in this issue

Archives of this issue

view archives of Design007 Magazine - Design007-Jan2019